Aviation

Project Owner:

Flagler County Airport 201 Airport Road Palm Coast, FL 32164

Completion Date:

Phase I: December 2004 Phase II: August 2005

Project Description:

As a sub-consultant to the architect, SGM provided mechanical, electrical and plumbing design services for this two-phase project. The overall project included design documents for HVAC, electrical and plumbing disciplines for a non-fueled aircraft hangar facility and adjoining offices spaces to meet Florida Building Code requirements.

Flagler County Airport at SGM Engineering


Project Owner:

Greater Orlando Aviation Authority, Orlando International Airport, Facilities & Construction, Orlando, Florida

Completion Date:

January 2007

Project Description:

SGM Engineering was part of the design-build team to provide MEP services for this three story office building located at the Cargo Road CEF Complex. Scope of services included designing a new HVAC, electrical systems and audio for installation. There are two, air-cooled chillers, each with a minimum of two independent refrigerant circuits. Power for the HVAC equipment is fed from a separated 480V branch of the distribution system. The new office building is fed from the exterior mounted 277/480V switchboard located in the chiller service yard.

Greater Orlando Aviation Authority at SGM Engineering


Project Owner:

Greater Orlando Aviation Authority, Facilities & Construction, Orlando Florida

Completion Date:

2005

Project Description:

SGM Engineering's role in the project was to act on behalf of GOAA as the owner's representative to perform construction administrative duties to verify the project was constructed per the MEP plans and specifications. The scope of the project was to replace existing elevators and provided new elevator equipment penthouses, replace escalators, renovations to restrooms, and install monitoring system for the new elevators and escalators in the landside terminal and parking lot. Sq ft 20,000 and construction cost $12.8 M.

Greater Orlando Aviation Authority at SGM Engineering


Project Owner:

Flagler County Airport 201 Airport Road Palm Coast, Florida

Completion Date:

The initial contract term is from 2006 through 2009, with two (2) one year extensions at the County's option.

Project Description:

SGM is providing MEP design services for this continuing contract. This contract includes all aspects of construction planning, master planning, design, quality control, and construction administration for projects involving airfield, as well as roadway construction, with heavy emphasis on runways, taxiways, taxilanes, aircraft parking aprons/ramps, airfield lighting systems, airport drainage, corporate hangars, T-hangars, and environmental permitting.

Flagler County Airport at SGM Engineering


Project Owner:

Greater Orlando Aviation Authority, Orlando International Airport, Facilities & Construction, Orlando Florida

Completion Date:

2007

Project Description:

SGM was contracted to perform mechanical, electrical, plumbing, and fire protection to this new 5,500 sq ft building. The new building was utilized for administrative offices and a customs facility. Construction Cost: $ 2.5M

Greater Orlando Aviation Authority at SGM Engineering


Project Owner:

The Panama City-Bay County Airport and Industrial District 3173 Airport Road, Box A Panama City, Florida 32405

Completion Date:

Professional Services September 2003 - August 2008

Project Description:

SGM is a sub-consultant commissioned to provide A/E Design Services for the Panama City-Bay County Airport and Industrial District.

The Panama City-Bay County Airport at SGM Engineering